I was wondering what everyone was doing for resources (CPU/Memory) on their VRAs? Currently the default is 1 CPU and 3 GB of RAM. I’ve just up the CPU to 2 and RAM to 8 GB.
We have ours pretty much set to the Max of 2 CPUs and 16Gig. This is primarily due to the fact that we have production data in both sites so every VRA is acting as a Protection and Target VRA.
The forum ‘VMware’ is closed to new topics and replies.