• This forum has 884 topics, 1,646 replies, and was last updated July 5, 2024 by Aaron M.
    • Support Q & A
    • Licensing Question / Multiple Environments On Same

      We would like to know if it is a supportable configuration to split our Zerto environment in half but have all of the VPGs running on the same hardware (ESXi 6.7/VNX). Is it possible to run multiple VRMs in the same environment? The VPGs and VMs would be separate and managed exclusively by one of […]

    • People: 3
      Replies: 3
    • December 2, 2019
    • upgrade to 7.5

      I am planning on upgrading to 7.5 but I want to see what are the requirements or procedures of the upgrade and also compatibility with vcenter. The last time we upgraded zerto, there was a small downtime since it wasn’t compatible yet with vcenter 6.7. Thanks, Michelle

    • People: 2
      Replies: 3
    • December 2, 2019
    • Zerto Uninstall for upgrade

      I’m working on upgrading zerto from 5.0 to 7.0. I have license and vpg settings saved but before i do the uninstall do i need to remove the vras and unpair the sites?

    • People: 2
      Replies: 1
    • December 2, 2019
    • Multiple Lockdown Mode Events in ESXi hosts

      I see Change Lockdown Mode Events on my ESXi hosts every day post 12 AM EST which is basically testing ZVM connectivity to hosts. Is there any logging on the ZVM servers which can determine what is happening during lock down mode on the ESXi hosts. Does it do enable strict or Normal Lock down […]

    • People: 2
      Replies: 3
    • December 2, 2019
    • About initial synchronization processing time

      I want to measure the throughput during initial synchronization. Does the actual capacity of the target machine affect the initial synchronization processing time? Or does the reserved capacity of the target machine affect the processing time of the initial synchronization? UseWanCompression is set to false.

    • People: 2
      Replies: 1
    • December 2, 2019
    • Regarding zerto trial license

      Hello, I requested “Zerto Trial license-free for 14 days” for some client PoC test and show up “You will receive and email with instructions shortly” message but I didn’t get any mail from zerto.com. In general, how long will it’s take times to get the mail? Thanks.

    • People: 2
      Replies: 1
    • December 2, 2019
    • Zerto connectivity

      We have a question regarding connectivity between ESXi and ZVM. Could you please confirm that ZVM access to ESXi hosts is ONLY required during installation of VRA.I mean Once VRA installation is completed can we close close ports.

    • People: 3
      Replies: 2
    • November 29, 2019
    • Zerto’s Monitoring Tab

      -Posted on behalf of Asahi Lio I have a question about “TASKS” in Zerto’s “Monitoring” tab. Can I check the information before 48 hours from this screen? For example, can I check information 72 hours ago from this “TASKS” screen? Kind Regards,

    • People: 2
      Replies: 1
    • November 27, 2019
    • Number of VM’s in a single VPG

      Posting on behalf of Andy K. Is there a limit to the number of VM’s I can put into a single VPG? Is there a best practice limit on how I should put into a single VPG before creating a 2nd VPG?

    • People: 3
      Replies: 3
    • November 26, 2019
    • Retention report

      I have the retention enabled for a specific vpg/vm. Can I somehow export a report that shows the Backup tasks for this vpg ?

    • People: 2
      Replies: 1
    • November 22, 2019
    • Move VPG with RDM MSCS cluster

      Hi all, Can any one share what are the best practises on how to set up VPG to move MSCS cluster with RDM disks? Active node will be moved with RDM’s. The Passive node is pointing to VMDK’s of active node. So the passive node can be moved with only OS disk attached to it […]

    • People: 2
      Replies: 1
    • November 22, 2019

The forum ‘Support Q & A’ is closed to new topics and replies.